When Is the Right Time to Appoint a CDM Principal Designer?
Appointing a CDM Principal Designer at the right time is a key step in managing risk on a construction or refurbishment project. This guide explains when an appointment is required, the benefits of appointing early and how to prepare.
When Is a CDM Principal Designer Required?
Regulation 5 of the Construction (Design and Management) Regulations 2015 requires a client to appoint a CDM Principal Designer in writing when more than one contractor is involved, or is reasonably expected to be involved. The appointment must be made as soon as practicable and always before the construction phase starts.
Ideally, appoint while the design is taking shape, so the team can respond to issues the Principal Designer identifies. If a commercial client does not make the appointment, it must fulfil the Principal Designer’s duties itself.
The CDM Principal Designer and the Building Regulations Principal Designer are distinct roles with different duties. Our CDM Principal Designer FAQs explain the distinction.
Is a CDM Principal Designer Needed for a Small Refurbishment?
Often, yes: the requirement depends on contractor numbers, not project size. A small office refurbishment managed by one fit-out company still involves multiple contractors if it uses separate electrical or mechanical subcontractors, even when they work on different days. When planning, establish how the work will be delivered, especially if the main contractor is expected to subcontract parts of it.
When this requirement applies, the client must also appoint a Principal Contractor in writing. The CDM Principal Designer plans, manages, monitors and coordinates pre-construction health and safety; the Principal Contractor leads on health and safety during construction.
How Does Appointing Early Help?
In an occupied office refurbishment, the team may be planning service routes, phasing and which areas staff can continue to use. Appointing a CDM Principal Designer early allows time to assess whether existing asbestos information is adequate for the proposed work. A management survey alone may not provide enough information for work that disturbs the building fabric, and a refurbishment survey may be needed in the affected areas. If asbestos is found on a proposed service route, designers can explore alternatives while the layout remains flexible. The Principal Designer can then ensure the Principal Contractor has the information needed to plan safely.
Larger developments benefit in the same way. Our work on a constrained London site beside a railway viaduct illustrates how basement excavation, temporary works, crane positions and deliveries can all influence one another. Addressing these issues as the design and construction sequence develop gives the team more options for managing risks to workers, neighbours and the public.
What Information Should You Prepare for the Appointment?
A brief project outline is enough to begin. Gather the information you already have on:
- The planned work, including layouts or design options being considered.
- The building or site: existing drawings, surveys, asbestos information and any existing Health and Safety File.
- The people and organisations involved, including designers, appointed contractors and anticipated specialist trades.
- The programme and any constraints, including continued occupation, limited access or a fixed handover date.
Use this information to confirm that the proposed Principal Designer is a designer with the skills, knowledge, experience and, where relevant, organisational capability needed for the project. The appointed Principal Designer must have control over the pre-construction phase, with access to those making design decisions. The HSE’s guidance on the Principal Designer role explains the duties in more detail.
What Should You Do If Design Has Already Started?
Appoint without further delay. Share current drawings, survey findings and a record of earlier decisions so the Principal Designer can identify risks already addressed and those still outstanding. If design continues during construction, agree how the Principal Designer and Principal Contractor will communicate changes and assess their implications.
Choose Richardson-Hill as Your CDM Principal Designer
Richardson-Hill provides CDM Principal Designer services under CDM 2015 for construction and refurbishment projects across London and the South East. We help your design team identify gaps in pre-construction information, coordinate responses to design risks and pass relevant information to the Principal Contractor. If you are unsure which appointments your project requires, we can also act as CDM Client Adviser. Learn more about our CDM Principal Designer services.
Share your plans, the current design stage and your expected start date. Contact Richardson-Hill to discuss the project, or call 020 8524 8396.